A collection of architectural, structural, and design management projects

across residential, public, industrial, and international sectors.

Our work spans schools, residential communities, industrial parks, high-rise towers, public facilities, and urban renewal projects. With expertise in multidisciplinary design, whole-process design management, and structural optimization, we deliver reliable, efficient, and technically rigorous solutions for clients in China and abroad.

f2345aadce73f19596d33e16cf1b1ef0
3f2f0176dd36f295ca1f9d94e04961a2

CT05 & CT06 Mixed-use Development — Hanoi, Vietnam

GFA: ~900,000 sqm
Type: Mixed-use / Residential / Commercial
Role: Full-discipline design (Architecture + Structure + MEP)
Codes: Eurocode + Vietnam Standards

Scope of Work
• Full architectural, structural, and MEP construction design
• Structural system design for towers and podium
• Coordination across all disciplines
• Review and compliance with Vietnam local standards

Highlights
• Large-scale international development
• Multi-tower configuration with complex functional interfaces
• High coordination requirement between disciplines

Summary

PEASPER Engineering delivered full-discipline design for this large-scale mixed-use development in Hanoi. The project required comprehensive coordination across architecture, structure, and MEP while meeting both Eurocode and local Vietnam requirements. The team ensured design clarity, structural safety, and a fully coordinated set of construction drawings for a development of nearly one million square meters.

2f37b0d7c82256cc96ce3faac58e28d7

Kantharyar Center — Yangon, Myanmar

GFA: ~121,100 sqm
Type: Commercial & Office
Role: Structural Optimization
Codes: U.S. Standards

Scope of Work
• Structural system evaluation
• Lateral load optimization
• Long-span structural refinement
• Value engineering

Highlights
• Designed according to U.S. codes
• Large commercial complex in Southeast Asia
• Significant cost savings via VE

Summary

PEASPER Engineering provided structural optimization services for the Kantharyar Center in Yangon. The design team refined the lateral system, optimized structural member sizing, and improved overall seismic and wind performance based on U.S. structural codes. The optimization achieved better material efficiency while maintaining structural reliability.

8ca7e2df17cb3722970bcdabf69201ed

New Energy Battery Manufacturing Plant — Ganzhou, China

GFA: ~121,100 sqm
Type: Industrial / Factory
Role: Structural Optimization
Year: 2022–2023

Scope of Work
• Structural system optimization for industrial plant
• Foundation and column grid refinement
• Steel consumption optimization

Highlights
• Large-span industrial structure
• Focus on cost reduction and efficiency
• Multi-building coordinated design

Summary

For this large-scale industrial plant manufacturing 18 million kVAh batteries per year, PEASPER Engineering optimized the structural system with an emphasis on industrial efficiency and construction feasibility. The optimization significantly reduced steel quantities and improved the structural layout while ensuring safety and serviceability.

64263d90a88e4f99c037e984026110bd
bb70ab0aa2427f914f716937d17f16eb

Yuejing Bay Phases 1–5 — Shanwei, China

GFA: 1,026,900 sqm
Type: Residential + Commercial Complex
Role: Full Construction Drawings

Scope of Work
• Architectural, structural, and MEP construction drawing package
• Multi-phase large residential complex
• Technical coordination & construction support

Highlights
• Over 1 million sqm
• Multi-phase urban residential development
• High-density structural layout

Summary

PEASPER Engineering delivered full construction drawings for the 1.02-million-sqm Yuejing Bay development. The project required multi-phase coordination, complex functional planning, and reliable structural solutions to support large-scale residential and commercial components.

496405c0093bd300eec35d3b2de7ed50
1e659d7daa63a156d2dfab69db6088a3

Luhu Technology Park — Longhua, Shenzhen

GFA: ~210,000 sqm
Type: Office / Hotel / Tech Park (High-rise)
Role: Super High-rise Structural Consulting + Construction Drawings
Year: 2024

Scope of Work
• Super high-rise structural consulting
• Seismic & wind load evaluation
• Full construction drawing package
• Multi-discipline coordination

Highlights
• Large high-rise tech campus
• Complex building functions including office + hotel
• Requirements for high coordination accuracy

Summary

PEASPER Engineering provided structural consulting and full construction documentation services for the 210,000-sqm Luhu Technology Park. The scope included high-rise structural system evaluation, wind/seismic performance checks, and complete multi-disciplinary coordination to ensure compliance and buildability.

27e4041cac6736a030ef84fe83aa7fee
b67fcb9b8ac0aea568db007d517596cd
587c2f88afe3cdc9737e5c444825c960

Yango City · Houjie Tianyun Garden — Dongguan, China

GFA: 278,700 sqm
Type: Residential Development
Role: Full Construction Drawings (Architecture + Structure + MEP)
Design Period: 2020

Scope of Work
• Full architectural, structural, and MEP construction drawing package
• Technical coordination between design disciplines
• Structural system design and analysis
• Construction documentation and refinement

Highlights
• Large-scale high-density residential community
• Multi-building development with complex site layout
• High requirements for coordination and deliverable accuracy
• Efficient structural solutions tailored for rapid development cycles

Summary

PEASPER Engineering delivered the complete construction drawing package for the 278,700 sqm Tianyun Garden residential development in Houjie, Dongguan.
The scope included architecture, structure, and MEP documentation, ensuring full technical coordination and construction-ready detailing.
The team optimized building layouts and structural systems to support efficient construction and long-term safety performance.

1e7bae8b72bf7ad51492666d570974f7

South China Logistics Park Benefit-Balancing School — Longhua, Shenzhen

GFA: 70,000 sqm
Location: Minzhi Subdistrict, Longhua District, Shenzhen
Project Type: Educational Facility
Role: Preliminary Design (Architecture + Structure + MEP)
Design Period: 2024 – Present

Scope of Work
• Preliminary architectural, structural, and MEP design
• Site planning and functional layout development
• Structural scheme design for teaching buildings, gymnasium, and auxiliary facilities
• Technical coordination across disciplines
• Early-stage feasibility and compliance review

Highlights
• Large-scale public school within major logistics park redevelopment
• Complex circulation and functional zoning requirements
• Early-stage structural scheme evaluation
• Integration of educational standards & urban planning guidelines
• Multi-building campus requiring cross-disciplinary coordination

Summary

PEASPER Engineering is responsible for the preliminary design of the 70,000 sqm Benefit-Balancing School within the South China Logistics Park redevelopment in Longhua District, Shenzhen.
The team developed the architectural scheme, structural concept, and MEP layout while ensuring compliance with educational building standards and coordination across all disciplines.
This early-stage design establishes a clear foundation for subsequent construction documentation and efficient project execution.

7d26fcddd2f7c0dfbc2ff716f60e53ef

Pinggang Middle School — Longgang, Shenzhen

GFA: 29,700 sqm
Location: Longgang District, Shenzhen
Project Type: Educational Facility
Role: Construction Document Design (Architecture + Structure + MEP)
Design Period: 2024 – Present

Scope of Work
• Full construction documentation across architecture, structure, and MEP
• Detailed structural design for teaching blocks, labs, administration areas, and sports facilities
• Compliance with educational building standards and local regulations
• Multi-disciplinary coordination to ensure constructability
• Technical refinement for site constraints and phased development

Highlights
• Mid-scale public school requiring high-quality detailing
• Multiple functional zones including classrooms, labs, library, sports spaces
• High coordination demands due to tight site conditions
• Focus on safe, efficient, and durable structural solutions
• Construction-ready documentation supporting smooth project execution

Summary

PEASPER Engineering is delivering the full construction document design for the 29,700 sqm Pinggang Middle School in Longgang District, Shenzhen.
The project covers architecture, structural engineering, and MEP design, with an emphasis on compliance, coordination, and construction feasibility.
The resulting documentation ensures that all disciplines are fully aligned, providing a reliable foundation for efficient and high-quality construction of this public educational facility.

Design Consulting

Centered on cost efficiency and supported by strong technical expertise, we provide a comprehensive suite of services including full-process technical consulting (resolving project-wide technical challenges), optimization consulting (addressing cost and structural efficiency issues), and detailed drawing review (ensuring accuracy, constructability, and compliance).

This integrated approach enables us to deliver a coordinated and cost-effective design management ecosystem for our clients.

1566ec06c4f1aa3fb68f20352d50f9e4

Bihai Garden Shantytown Redevelopment Project — Bao’an, Shenzhen

GFA: 173,900 sqm
Location: Bao’an District, Shenzhen
Project Type: Residential Development
Role: Structural Overrun Report & Technical Review
Design Period: 2022

Scope of Work
• Preparation of structural overrun review report
• Comprehensive structural safety evaluation
• Compliance verification with local building codes
• Assessment of structural system, load paths, and lateral resistance
• Technical review and refinement of structural documentation

Highlights
• Large-scale residential redevelopment within an urban renewal zone
• Multiple residential towers with high-density planning
• Complex structural interfaces requiring careful review
• High standards for safety and code compliance

Summary

PEASPER Engineering conducted the structural overrun review and compliance assessment for the 173,900 sqm Bihai Garden Shantytown Redevelopment Project in Bao’an District.
The team evaluated the building’s lateral and vertical systems, verified compliance with Shenzhen and national structural standards, and provided detailed technical recommendations to ensure structural safety and construction feasibility.
The review strengthened design reliability and provided essential support for this major urban renewal development.

9441bf50011f18862c22157ca59af3f8

Huilongpu Community · Changjiang Cable Factory Urban Renewal Unit — Longgang, Shenzhen

GFA: ~150,000 sqm
Location: Longgang District, Shenzhen
Project Type: Residential Development / Urban Renewal
Role: Structural Overrun Report & Technical Review
Design Period: 2022

Scope of Work
• Structural overrun report preparation
• Comprehensive structural safety and stability evaluation
• Wind and seismic performance assessment
• Verification of lateral and vertical load-bearing systems
• Review of structural drawings and compliance with local codes

Highlights
• Urban renewal project with complex existing site conditions
• Multiple residential buildings with irregular layouts
• High-density development requiring detailed structural assessment
• Emphasis on safety, constructability, and regulatory compliance

Summary

PEASPER Engineering conducted the structural overrun review and technical assessment for the Changjiang Cable Factory Urban Renewal Unit in Huilongpu Community, Longgang District.
The scope included full structural evaluation, verification of load paths, wind and seismic resistance checks, and compliance review based on Shenzhen and national building codes.
The review ensured the structural system’s safety, robustness, and suitability for redevelopment within a densely planned residential district.

6f9e80a9537740f27d478b8cee0ceb9c
09e8c6a198cb6a97bde79c97813d5dbf

Taoyuan Subdistrict · Honghualing Industrial South Zone Renewal Unit — Nanshan, Shenzhen

GFA: 41.87 million sqm (as provided)
Location: Nanshan District, Shenzhen
Project Type: Industrial & Renewal Zone
Role: Structural Overrun Report & Technical Review
Design Period: 2024

Scope of Work
• Preparation of the structural overrun review report
• Comprehensive evaluation of building safety and structural performance
• Review of vertical and lateral load-bearing systems
• Wind and seismic performance assessment
• Verification of structural compliance with Shenzhen & national codes
• Technical refinement to support redevelopment planning and construction feasibility

Highlights
• Large-scale industrial renewal unit with significant redevelopment complexity
• Mixed-use industrial zone requiring cross-building structural assessment
• Focus on safety robustness and regulatory compliance
• Complex structural interfaces due to varying existing building conditions

Summary

PEASPER Engineering conducted the structural overrun review and technical assessment for the Honghualing Industrial South Zone Renewal Unit in Taoyuan Subdistrict, Nanshan.
The evaluation included full structural system analysis, wind and seismic resistance checks, and compliance verification across multiple industrial buildings within the renewal zone.
Through detailed technical review and refinement, the assessment ensured the structural safety, feasibility, and regulatory alignment required for this large-scale industrial redevelopment.

7d65bb32eae7ac8a7c7d78bd65dc4875

Dapeng New District Archives & Local Chronicles Museum — Dapeng, Shenzhen

GFA: 96,300 sqm
Location: Dapeng New District, Shenzhen
Project Type: Public Building
Role: Structural Overrun Report & Technical Review
Design Period: 2022

Scope of Work
• Preparation of structural overrun review report
• Full structural system evaluation
• Wind and seismic performance assessment
• Verification of structural layout, load paths, and lateral resistance
• Compliance review based on public building safety standards
• Technical refinement and documentation review

Highlights
• Large-scale government public building with strict safety requirements
• Complex functional zones including archives, exhibition spaces, and public service areas
• High structural safety standards due to archival storage functions
• Detailed performance evaluation for long-term durability & operational safety

Summary

PEASPER Engineering performed the structural overrun review and technical assessment for the 96,300 sqm Archives & Local Chronicles Museum in Dapeng New District.
The scope covered full structural system evaluation, wind and seismic resistance checks, and verification of compliance with public building codes and standards.
The review strengthened the reliability, safety, and constructability of the building, supporting the high functional requirements of an archival and public documentation facility.

43ab27e48d23ce5377ce8f22b18b6a5b
0fbfe9db7d97ee3d62141e230b559afd
a668786fcde0d0c20ce57b2a564fc61c
a07625625462bda9b3c7bcd583e67cd0
6461dbd1a4ba717f420467b3e1371360
6b0aad2c0b74c367a0de27f46d9e3e34

Baishigang Urban Renewal Supporting School — Dapeng New District, Shenzhen

GFA: 370,000 sqm
Location: Dapeng New District, Shenzhen
Project Type: Educational Facility / Public School
Role: MRR (Major Revision Review)
Design Period: 2024

Scope of Work
• Major Revision Review (MRR) for the entire educational complex
• Structural system evaluation for teaching buildings, labs, administration, and sports facilities
• Review of vertical and lateral load-bearing systems
• Wind and seismic performance checks
• Verification of compliance with school building codes and public safety standards
• Technical refinement to support design stability and construction feasibility

Highlights
• Large-scale educational facility within a major urban renewal district
• Complex functional zoning requiring multi-building coordination
• Higher safety requirements due to public school standards
• Review focused on structural reliability, practicality, and long-term performance
• Ensures alignment with Shenzhen and national educational building regulations

Summary

PEASPER Engineering conducted the Major Revision Review (MRR) for the 370,000 sqm Baishigang Urban Renewal Supporting School in Dapeng New District.
The work included full structural evaluation, wind and seismic performance checks, and technical compliance review for all major teaching and auxiliary buildings.
Through detailed assessment and refinement, the MRR strengthened the safety, feasibility, and regulatory alignment of this large public school development, supporting smooth progression into subsequent construction stages.

f83d3aa26d968c24021a2863e2060af5

Kingkey 100 Tower — Luohu, Shenzhen

GFA: 584,642 sqm
Site Area: 35,855 sqm
Demolished Existing Area: ~150,000 sqm
Height: 441.8 m
Floors: 100
Project Type: Super High-rise / Landmark Tower
Role: Structural Optimization & Technical Consulting

Scope of Work
• Structural optimization and economic analysis
• Comparative study of beam height & span configurations
• Finite element analysis (FEA) of long-span and cantilever nodes
• Global buckling analysis for large-span and cantilever components
• Floor serviceability & comfort verification under various layout schemes
• Cost–performance balancing, achieving significant material savings

Highlights
• Landmark 442 m tower in the core of Shenzhen CBD
• Complex super high-rise system requiring rigorous lateral performance evaluation
• Optimization achieved 20 million RMB in structural cost reduction
• In-depth FEA for critical nodes and cantilever zones
• Verified global stability and floor comfort through multiple scheme iterations
• Balanced stiffness, safety, and economic efficiency across competing design schemes

Technical Summary (High-End Version)

PEASPER Engineering provided comprehensive structural optimization and technical consulting services for the 441.8 m Kingkey 100 Tower—one of Shenzhen’s most iconic super high-rise buildings.

The consulting scope included a full economic comparison of structural schemes with varying beam depths and spans, enabling clients to choose the most material-efficient configuration without compromising performance.
Advanced finite element modeling was conducted on long-span and cantilevered components, assessing stress concentrations, deformation control, and node behavior.

Global buckling analysis was performed to ensure stability of the overall structural system, particularly in areas subjected to high lateral and vertical load interactions.
Multiple floor system layouts were evaluated for comfort, stiffness, and vibration control, ensuring serviceability while maintaining cost efficiency.

Through systematic optimization and rigorous technical evaluation, the project achieved over 20 million RMB in structural cost savings while maintaining the safety, stiffness, and performance requirements of a world-class super high-rise building.

Whole-Process Design Coordination Management

As part of our integrated design management system, we offer full-process coordination that aligns all disciplines into a single, controlled workflow.

Our methodology emphasizes technical clarity, efficient communication pathways, and risk-controlled decision-making throughout the design lifecycle.

model evolution

Design General Contracting
Management System

Value

  • Efficiency

    • Schedule: Overall design cycle, design progress monitoring

    • Communication: Client, government budget, construction, subcontractors

    • Execution: Collaborative platform, design process standardization

  • Quality

    • Project: Multi-system, multi-perspective review

    • Construction: Standardized construction coordination process

  • Cost

    • Personnel: Balanced design resources

    • Project: Design within budget limits, dynamic control, lifecycle cost, change control

  • Resources

    • Subcontractor teams: On-demand selection and optimization

    • Management team: Specialized subcontract management

Strategy

  • Structure

    • General commander, general contracting design team, general contracting management team, individual project management staffing, clear project responsibilities for all positions

  • System

    • Plan management, communication management, quality management

  • Technology

    • Performance evaluation, cost management, digitalization, main and specialized works

Management

  • Schedule Management

    • Plan formulation: Integrated project schedule workflow sheet, decomposable project objectives into design solutions, three-level planning modules (client, general contractor, subcontractors)

    • Plan execution: Three-level plan control

    • Management specialists: Feishu · construction drawing workflow and staffing, schedule node dispatch and approval, information alerts

    • Plan adjustment and approval: Change approval authority, plan approval, adjustment rules, standard templates

    • Plan change system

    • Plan dispute resolution: Drawing/work completion node disputes, drawing quality disputes, design node disputes

  • Communication Management

    • Client, government, construction coordination

  • Quality Management

    • Four-party collaborative management

  • Quality System Certification

    • Drawing quality: Standardized technical measures + guidelines and strategies, construction drawing evaluation system, design standard library, process execution system, review center, online quality audit

    • Quality supervision: Multi-perspective review, third-party drawing review, key control standards

  • Construction Quality: Adequate design information transfer, standardized site procedures, material sample approval process, technical detailing approval process, client quality requirements

  • Cost Management

    • Cost control

    • Change control

    • Design within budget preparation

    • Dynamic control optimization

    • Reasonable design cycle